Monday, February 10, 2014

Project 75I Contender Scorpene SSK with MESMA AIP Section at DefExpo 2014

A see through model of Project 75I contender Scorpene SSK with cutaway MESMA AIP xection at the DCNS pavilion at DefExpo 2014 
France's DCNS, which is pitching its Scorpene SSK with a MESMA AIP section as a Project 75I contender displayed a see through model of the submarine with the SUBTICS combat system and a cutaway of the optional MESMA AIP at its stall at DefExpo 2014.

The MESMA module is fitted as an additional hull section within Scorpene which then measures 76.10 meters long and displaces 2000 tons.

A see through model of Project 75I contender Scorpene SSK with cutaway MESMA AIP xection at the DCNS pavilion at DefExpo 2014


The Scorpene model was displayed next next to a model of the newly developed French Barracuda class nuclear submarine, to stress that the Scorpene features acoustic discretion and combat system performance developed for the Barracuda.

A model of the newly developed French Barracuda class SSN with the Scorpene SSK in the background at the DCNS pavilion at DefExpo 2014


SSN Suffren, the first Barracuda class submarine, is scheduled to start sea trials early 2016. Six Barracudas will replace the six Rubis/Améthyste-class SSNs currently in service.

Project 75I submarines are required to have a land attack capability, which in the case of the Scorpene will come from torpedo tube launched Exocet missile. No Brahmos on the Scorpene, which may not be such a bad idea.


Project 75I Submarines (IDP Sentinel)

No comments:

Post a Comment